简述了三峡工程永久船闸六闸首边墙混凝土高温季节施工的温控措施。
Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.
三峡工程—临时船闸上闸首、下闸首船闸液压系统总成。
Three Gorges Project-Upper and lower lock heads for the temporary ship lock Ship lock hydraulic system assembly.
应用推荐