钢与混凝土组合梁的设计和分析中,通过引入有效翼缘宽度的概念考虑混凝土翼板中剪力滞后的影响。
In the analysis and design of steel-concrete composite beams, the concept of effective flange width is introduced to consider the impact of shear lag.
在冷弯薄壁型钢结构中,为了降低层高而让管线从梁中通过,在梁和柱的腹板及翼缘中常需要开孔洞。
In cold-formed steel structures, we need to open holes on flange and web of beams and columns for the purpose of getting through the pipeline.
本文对外肋环板节点梁翼缘受拉模型的传力机理进行了分析。
Force transfer mechanism of the vertical stiffener joint model with only tensile beam flange is analyzed.
应用推荐