两个轴,一个代表重要性,一个代表紧急程度,二者相交。
Two axes, one for importance, the other for urgency, intersect.
根据紧急程度和流程需求,不同流程的日志级别可能不同。
The level of logging can vary from process to process based on the urgency and needs of the process.
根据待检验产品数量与紧急程度确定检验团队的大小与成员。
Determine size of inspector crew needed per production lot size and urgency.
应用推荐