箍索及焊接连接点与鼓身的凹槽保持一个平面。
The hoop cable, the welding joint and the groove of the drum body keep on a plane.
通过对景洪澜沧江大桥索塔顶端模型的加载测试,验证了箱壁中预应力环箍设计的可靠性。
By test-loading of model of the tower-top hollow section model for Lan-cang River long-span bridge in Jing-hong, adequacy of prestressed loop stirrup design is testified .
应用推荐