... 基于持有成本模型 Cost of Carry 算法成本模型 algorithmic cost model 结构成本模型 COCOMO ...
基于6个网页-相关网页
·2,447,543篇论文数据,部分数据来源于NoteExpress
在此基础上,提出了拆卸时间和拆卸成本的计算算法及0 1型拆卸优化模型。
Based on that, the algorithm for disassembly time and disassembly cost, and a 0-1 programming model of optimizing product's disassembly were established.
实例验算表明,所给模型及算法可以在合理的时间内求解大规模规划问题,有效地降低公司成本。
Examples of checking computations show that this model and algorithm can solve problems of planning on a large scale within a reasonable period of time, thus effectively reducing a company's costs.
在NGN网络体系分析基础上,基于综合成本概念建立网络拓扑优化模型,并提出了相应算法。
Topology optimization model based on the concept of TCO is derived from the structure analysis of NGN network, and correspondent algorithms are provided.
应用推荐