介绍了济宁二号煤矿箕斗装载硐室施工方案及技术。
The plan and technology of skip loading chamber construction in Jining No.
介绍了济宁二号煤矿箕斗装载硐室施工方案及技术。
The plan and technology of skip loading chamber construction in Jining No. 2 Coal Mine are introduced.
结合具体施工条件,对主井箕斗装载硐室施工方案进行了分析,选择了适宜的施工方案。
This paper associates with specific construction condition, analyses the construction scheme for main shaft pan loading chamber, and chooses proper construction scheme.
应用推荐