第一圈:在辫子的第二孔开始钩短针,一共9针,1个辫子针,翻过来。
Row 1: SC in second chain from hook and each of the rest. Ch 1, turn. (9)
第一孔板(3)和第二孔板(6)沿着排放头(10)的液体排放方向彼此分开并且彼此相对地设置。
The first orifice plate 3 and the second orifice plate 6 are separated from each other in the liquid discharge direction of the discharge head 10 and disposed opposite to each other.
锁紧板包括第一孔、第二孔和释放元件,其中第一孔能够接收从泵头伸出的钩,第二孔能够接收泵头的驱动轴。
The locking plate includes a first aperture capable of receiving a hook extending from a pump head, a second aperture capable of receiving a drive shaft of the pump head, and a release member.
应用推荐