报告给出了复杂断面上波浪爬高和越浪量的计算公式,计算中考虑了前滩、边坡糙率、边坡坡度、平台、波浪入射角以及竖墙等因素的影响。
The report takes account into the influence of foreshore and shallow foreshore, roughness, slope, berm, wave attack Angle, vertical wall and so on.
板墙筋竖筋分二次绑扎,第一次从底板留出插筋至止水钢板上口留出,搭接倍数,第二次绑扎至顶板面。
Two-time-binding is required for vertical re-bar of plank wall. First binding is made up to water stop plate, second binding is made up to top plate surface.
在大震作用下,人工竖缝发挥作用,改变了墙肢的破坏形态、降低了结构的刚度和地震作用。
In the case of seldomly occurred earthquake, the artificial vertical seams play their roles, changes the failure forms of coupling wall-column and lower structural stiffness and earthquake action.
应用推荐