只有对其进行时程分析,才能对其安全度进行全面评估;
Unless analyze time history, it could go on the overall assessment of safety.
在此基础上,提出了高层建筑钢结构抗震设计第二阶段安全检验的弹塑性时程分析实用方法建议。
A practical procedure of elastoplastic time history analysis safety check during the second stage of the aseismic design for steel structure is also suggested.
本文采用动力非线性有限元法研究了钢筋混凝土面板堆石坝的地震反应,并用滑移面上的静、动应力求得坝坡抗震稳定安全系数时程曲线。
A study on the dynamic response of a rockfill dam with reinforced concrete facing excited by earthquake by means of nonlinear finite element method was presented in this paper.
应用推荐