冷返矿集中到专门的矿槽,由圆盘给料机将返矿卸到皮带机上。
Cold back to mine the ore concentrate into specialized chutes, feeder by the disk will be returned to the ore unloading machine belt.
该装置解决了高温且物料流速较慢的矿槽料位上、下限检测的技术问题。
The technical problems present in measuring upper and lower limit of hot return sinter level in bin were solved.
本发明属于冶金炼铁技术领域,公开了一种两座焦矿槽系统合并工艺布置。
The invention belongs to the technical field of metallurgical iron making, and discloses a combination technical arrangement of two coke and ore tank systems.
应用推荐