特别是,软件团队采纳了下面的敏捷实践:迭代周期为两周的短迭代,客户参与,数据测量,角色分配和每两周的回顾会议。
Specifically, the software team adopted the following agile practices: short two-week iterations, customer involvement, measurements, role assignments, and bi-weekly retrospective sessions.
就是在上丁北面的湄公河上,我看见了在地球上最后幸存的短吻海豚。
It was at the Mekong, just north of Stung Treng, that I set out to see the Irrawaddy river dolphins, some of the last remaining on the planet.
服务在短于 t1 到 t2 的间隔里以按需方式占用这些资源,而 t1 到 t2 的间隔是客户端方面的事务总持续时间。
The server requires these resources on an on-demand basis for a much shorter period than the time span between t1 and t2, which is the total duration of the transaction from the client's perspective.
应用推荐