对于该监查机制的改进正在研究之中。
Improvements in the monitoring mechanism are being considered.
在这份调查报告中,监查长列举了亚利桑那州工作人员的种种违法行为。
In its report, the inspector general listed several violations by the Arizona employees.
报告称,NISA就核电站关键设备的监查对东京电力公司提出了警告,其中包括循环泵的问题。
It says that NISA warned TEPCO about its failure to inspect critical machinery at the plant, including recirculation pumps.
应用推荐