植物群落可以自由地聚集,并且,它们的特殊结构由该区域的具体历史情况所决定。
Plant communities assemble themselves flexibly, and their particular structure depends on the specific history of the area.
因而,当开发人员检查她分配的活动时,每个活动都与一个发布相结合,这就说明对于特殊的UCM项目有一个具体的分配。
Then, when a developer examines her assigned activities, each activity is tied to a release unit and therefore there is a concrete assignment to a particular UCM project.
要重新计算特殊起始和终止时间的结果,您可以指定这个报告的具体时间段。
To recalculate results for particular start and stop times, you can specify a time range for a report.
应用推荐