本文对黑龙江岁宝热电厂扩建工程的循环供水系统进行了方案比较,确定最优方案的实施。
This paper compares different design schemes of circulation water-supplying system of suibao thermal power plant in Heilongjiang province, determines the best design schemes.
介绍了银川热电厂二期工程投运一年以后,多次出现凝汽器真空缓慢下降的现象。
The phenomena of condenser vacuum slowly running down occurred many times in Yinchuan Congeneration Power Plant.
主要介绍了在控制爆破拆除槐阳热电厂宿舍楼中,爆破方案的选取,参数的选择以及实爆效果等方面的实践,可作类似工程参考。
Taking the project of student dormitory building as an example, several treatment schemes about the overexcavtion of base in pond are introduced.