最后,通过现场高喷试验,确定高喷灌浆的施工参数。
Finally, the construction parameters are defined by the on-situ high-pressure gunite experiment.
提出了大循环灌浆方案,很好地解决了循环式灌浆的流量检测问题。
Present the macro cycle grouting plan, resolve the flow testing problem of the cycle grouting.
坝基帷幕灌浆使用灌浆自动记录系统,对灌浆的质量实现了有效的控制。
During the grouting, an automatic recording system for grouting is used, with which the grouting quality is effectively controlled.
应用推荐