剪切操作通常是打包和运输之前的最后一道工序,是工厂满负荷运转时的瓶颈环节。
The operation, usually the last before packing and shipping, represented a bottleneck when the plant was operating at full production.
请勿操作和阀芯下满负荷连续超过一分钟。
Don't operate and spool under full load over one minute continuously.
为了满足满负荷生产的需要,根据实际操作条件,调整了原设计曲线。
The baking process of the baking furnace for making anodes is modified in order to meet the demands for operation conditions, that is the fuel and draft level.
应用推荐