本文利用变区域上变分有限元方法求解了溢流坝自由溢流和闸下出流问题。
Using the variable domain finite element method, the problem of the flow over a gated or free spillway has been solved successfully.
本文是以合面狮水电站大坝的溢流坝闸墩为研究对象。
This paper mainly studied the sluice pier of HeMianShi hydroelectric station.
本文通过310组试验,研究了上游面倾斜的溢流坝的闸墩布置。
The pier arrangement on spillway crest with sloping upstream face is studied by 310 sets of experiments in the paper.
应用推荐