·2,447,543篇论文数据,部分数据来源于NoteExpress
依据海底土壤和积冰负荷的情况,钢桩会被打入海底10米至20米深。
The three piles are driven 10 to 20 metres into the seabed depending on soil conditions and ice loads.
youdao
应用推荐
模块上移
模块下移
不移动