本文首先结合既有的风险分析理论和方法,建立了大跨连续刚构桥施工期间地震及洪水风险分析的基本流程。
Combined with the exiting risk theory, the basic processes of risk analysis concerning earthquake and flood for long-span continuous rigid-frame Bridges during construction are established.
防洪风险分析中一项基础性的工作是对洪水过程计算中的淹没范围进行模拟分析。
The fundamental work in the Flood Risk Analysis is to simulate the flood submerging range, which belongs to the computation of flood process.
蓄滞洪区洪水模拟是风险分析与居民防洪避险等非工程措施的重要依据。
The flood simulation in flood detention basin is the basis of non engineering measure such as risk analysis and resident hazard prevention.
应用推荐