九江发电厂1号循泵变极改造后节能效果明显,对降低厂用电率、提高机组运行整体经济性的效果显著。
After retrofit of no. 1 circulating-water pump pole-change in Jiujiang power plant, energy saving effect is obvious, it can reduce service power rate and increase total economy of units operation.
关于电荷泵的更多信息可查阅全文以引用的方式并入本文中的第6,734,718号美国专利。
More information about charge pumps can be found in U. S. Pat. No. 6,734,718, incorporated herein by reference in its entirety.
这台低(中、高)压鼓风机(泵)将在三号车间里予以装配。
This low (middle, high) pressure blower (pump) will be assembled in the No. 3 workshop.
应用推荐