本文应用冲击机械系统动力学分析打桩过程中锤体与桩撞击时应力波的产生、传播以及该波对沉桩过程的影响。
Mechanical impact dynamics is used to analyse the production and spread of stress wave when hydraulic pile hammer hammerblows piles, the stress wave influence the course of driving pile.
本文对影响振动桩锤沉桩能力的土力因素进行了研究。
In this paper the attention is paid to study the soil-related factors affect the vibro-driveability.
应用推荐