【Key words】 hydropower generation scheduling; electric price; optimal strategy; risk preference; Markov decision process; minimum risk criteria
基于6个网页-相关网页
为提高蓄能电站发电收益,建立了基于长期水文预报的水库优化调度方案。
To increase power generating benefits of the pumped-storage station, this paper mainly discussed the program of reservoir dispatching optimization, which based on long-term hydrological forecasting.
基于马尔可夫过程的水库发电优化调度,受到广泛研究的优化准则是收益期望值最优。
For the reservoir generation operation based on the Markov process, the extensively applied optimization criterion is the optimal expectations revenue.
该系统集成了洪水预报、水库调度、发电优化、数据整编等各方面功能,并可进行梯级电站联合调度。
The system combines flood forecasting, power generation optimization, data reorganization and many functions so on and can make joint dispatching of cascade hydropower stations.
应用推荐