通常对设有调压室的引水管道进行水击计算时,常规计算方法认为调压室能完全反射水击波。
When calculating water hammer force in derivation conduit with a surge chamber, the ordinary method usually thinks that the surge chamber can completely reflect the water hammer wave.
工程爆破中的灾害主要有爆破有毒气体、扬尘、噪声、飞石、振动和爆破引起的触地振动、爆破水灾和涌浪、空气冲击波或水击波等。
Disasters in engineering blasting includes toxic gas, dust, noise, fly rock, blasting vibration, touchdown vibration, flood caused by blasting, ground swell, air or water blasting wave.
提出了利用管道水击过程中的正压波确定天然气管道冰堵位置的原理和方法。
The theory to confirm the location of blockage in pipeline which using the positive wave happened in the course of water hammer was first put forward in the paper.
应用推荐