对闵行发电厂10号炉乏气送粉制粉系统爆炸事件进行了分析。
Analyzes the explosion accident of the PF bunker type milling system with exhaust gas as the conveyance medium of NO. 10 boiler in Minhang Power Plant.
讨论从改进光缆结构出发来提高气送光缆的效率和延长气送光缆的距离。
Optical cable structure is improved in order to enhance the installation efficiency of the blowing method and to increase the length to be installed.
通过对PTA气送糟料仓的结构进行疲劳分析和优化,从根本上解决了其裂纹和焊缝撕裂现象。
The problems were essentially resolved through fatigue analysis and optimization of the structure of feed bin of PTA pneumatic transmission channel.
应用推荐