针对结构件展开放样中遇到的问题,应用数学计算法解决比例放样无法解决的问题。
In this paper, we use mathematics to solve the problem of structure lofting which can't be solved by scale lofting.
在连续梁和工业建筑框架的塑性设计中,这一步往往只不过是确定所需构件尺寸的比例关系而已。
In the plastic design of continuous beams and industrial building frames, this step frequently involves no more than a determination of the ratios of required member sizes.
这一特性对钢管高强混凝土轴压构件的徐变值大小以及徐变过程中核心混凝土的卸载比例、钢管最终的应力路径等有重大的影响。
This speciality has great effect on the amount of creep, unloading proportion of core concrete and stress path of steel tube, and so on.
应用推荐