对于卷曲预应力钢,在展开一段钢丝或钢绞线之后,除非在相应的欧洲技术认可有规定,否则其最大船首高度必须符合EN 10138规定。
P For coiled prestressing tendons, after uncoiling a length of wire or strand the maximum bow height shall comply with en 10138 unless given in an appropriate European Technical Approval.
在燃料棒开始融化后一段时间里,热量可能融化四到八英寸厚的反应堆的容器钢壁。
总导演张继钢称,其中有一段由320名聋哑演员表演的大型舞蹈。
The ceremony, on Saturday, will include a dance by 320 deaf-mute performers, chief director Zhang Jigang said.
应用推荐