每跨50米,纵横向预应力体系;采用移动模架法自南向北逐跨施工。
Each span is 50 metres long, which was constructed with span by span method from south to north.
研究目的:研究顶板横向预应力钢束对箱梁横向计算结果的影响,给箱梁结构设计提供借鉴和帮助。
Research purposes: This paper analyzes the effect of the lateral prestressing tendon in top deck on the lateral calculation result of box beam.
利用设置桥面横向预应力的技术,增强桥面的横向联结刚度,改善空心板梁与桥面板的共同受力性能。
Transverse pre-stress steel wire is set in order to advance the transverse rigidity of the deck and improve the stressed state of the cellular slab and the deck.
应用推荐