方法采用拓能系统的固定装置、计划系统、激光灯、弓形尺、头部模型(简称头模)模拟3D CRT的实施过程进行质量控制分组实验。
Methods To do quality control experiments to simulate the process of 3D-CRT by means of Topsland system, radiation treatment -planning system, laser light, bow form ruler, head model.
利用流程模拟得到的装置模型,对常压塔常一线航煤进行离线操作优化,达到航煤产量最大化的目标。
With the draw ratio of aviation kerosene as the optimization objective, off-line operating optimization has been done by the plant model of process simulation.
对模型环道蜡沉积装置测试段流场温度场进行了数值模拟。
Numerical simulation of flow and temperature field in the test tube of Model Loop Wax Deposition Apparatus was performed.
应用推荐