介绍了一种利用料斗秤模拟桥式抓斗卸船机给煤皮带流量的方法,该方法基于PLC程序实现。
This paper introduced a method of using hopper scale to simulate bridge-type grab ship unloaded by feeder belt flow. It is implemented based on PLC program.
用弹簧单元模拟桥面板与钢梁的联结,结果表明该桥混凝土桥面板与钢梁的联结比较紧密,二者的联结可以视为固结。
Using spring to model the shear connection between concrete slab and steel girders shows that the connection is comparatively strong and can be treated as full restrained.
通过模拟桥址地形的风洞试验,确定桥梁设计基准风速和相关的风特性参数,使得到的风速真正反映桥址处风的实际状况。
The design reference wind speed and related wind characteristic parameters of the bridge are derived from the wind tunnel test of a terrain model of the bridge site.
应用推荐