当“井”字梁结构外露,特别是梁的高度与宽度都较大时,对消防喷头的布置带来很大影响。
When the grillage beam structure is exposed outside, especially when the height and width of the beam are relatively large, the spray head layout will be greatly influenced.
第四阶段包括降低位于屋顶的电缆系统和梁的高度,这有助于给卧室留出空间。而在卧室中,木材是主要的材料。
Lastly, the fourth phase consisted on lowering a system of cables and beams from the roof which helps to give form to the bedrooms, where wood is the main material.
我们建议在保证结构强度的前提下采用多孔梁以整合管线布置,能够更有效的释放空间高度。
We suggest that under the premise of structural strength, using porous beam to integrate pipeline layout in order to release space height effectively.
应用推荐