隧洞衬砌采用针梁滑模、全断面一次浇筑的方法施工,可以减少工序作业,保证施工质量。
The tunnel is lined with the method "single placement for the full cross using needle beam sliding form", which can save construction procedures while ensuring quality.
在庙宫水库排沙洞的衬砌施工中使用了针梁式混凝土衬砌钢模台车。
We have used needle beam telescoping steel form in the Mao-Gong reservoir sediment tunnel in the concrete lining.
并对主梁立模标高和斜拉索的张拉索力的主动修正问题进行了分析和讨论。
Furthermore, the analysis and discussion have been done on the problem of making an active correction to the formwork erection elevation of the main beam and cable force.
应用推荐