本文简要介绍了烟台港三期工程集装箱码头装卸桥后轨道梁基础处理方案的比选、优化,施工要点与实施效果。
This paper briefly introduces the proposal and construction of foundation treatment for rare-beam of container crane at Container Terminal, Yantai Port (Phase Three Project).
因主要排油期发生较晚,致使油气近距离运移为主,禹城洼陷和梁水镇洼陷两个主要油源区控制着凹陷中最有远景区的分布。
Yucheng sag and Liangshuizhen sag are the two main oil source areas and control the distribution of the most prospective areas in the depression.
墩顶负弯矩主要来自于二期恒载和活载。当桥墩较高时,刚架桥可简化为连续梁桥计算。
When the pier is high, rigid-framed bridge can be simplified to continuous beam bridge.
应用推荐