并采用A NSYS有限元分析方法对夹桩器上均布液压缸数进行了选择。
And the ANSYS finite element analysis is used to choose the number of hydraulic pressure vats, which are distributed in the pile gripper.
论述了冲击钻钻孔灌注桩施工工艺及断桩和桩身夹泥的处理措施。
The processing measure was introduccd by the impact drilling filling pile construction craft and broken pile and the pile body clamps the putty.
应用推荐