摘要:设计是根据设计任务书的要求和《公路桥规》的规定对胜利河桥进行方案比选和设计的。
Abstract: The design is based on the requirements of the design task and "Highway Bridge Regulation".
为使公路桥设计更能适应发展趋势,通过参考英、美两本新桥规,提出所需明确的6个问题:①常规和特殊活荷载;
For improving our highway bridge design, the authors refer to two new specifications from UK and USA, and raise 6 problems for discussion:1. Normal and special traffic live loading;
集中力作用处剪力滞效应与其它截面相比明显增大,我国现行桥规(JTJ023-85)中关于有效宽度取全桥等宽的说法需要进一步研究。
The shear lag effect of the section under concentrated load is more remarkable than that of other sections. National Standard (JTJ023-85) is worth discussing further.
应用推荐