安装前要对起重机安装跨度,金属结构主梁的拱度、水平旁弯,小车轨道高低差、轨距偏差,桥架对角线等进行测量。
To install the crane span before installation, camber, level of metal structure of main girder bending, trolley rail height difference, gauge deviation, diagonal bridge survey.
借助1∶30的整体模型,研究了施工阶段、成桥阶段全桥主梁的应力水平及分布状况。
The stress level and distribution of the main girder during construction and service stage at 1/30 model are studied.
对于风力作用下所引起的桥梁主梁抖振反应,通常采用全桥风洞试验或断面模型风洞试验配合数值分析进行评估。
Generally, either the full bridge model wind tunnel test or section model wind tunnel test with analytical procedure is used to evaluate buffeting responses of Bridges.
应用推荐