阐述了桥梁静载试验的加载原则、加载方案设计和测点布置规则。
The loading principle, loading project and rule of measuring-point arrangement for bridge static test are presented.
传统的桥梁静载检测方法工作面大,加载时间长,通常要中断交通。
Traditional quiet load methods of bridge test need the heavy working range, long time to load, and usually breaking down the traffic.
本文提出了替代传统桥梁静载试验的行进加载试验,介绍了行进加载试验的加载方法以及影响因素。
In this paper a moving loading test was proposed to instead the conventional static loading test, and its loading method and effect factors are introduced.
应用推荐