本文应用梁格分析方法,简述了公路梁桥主梁剪力荷载横向分布的特性。
In this paper, the behaviour of the transverse load distribution of the girder shear force in a highway beam bridge is simply explained by using grillage analysis.
借助1∶30的整体模型,研究了施工阶段、成桥阶段全桥主梁的应力水平及分布状况。
The stress level and distribution of the main girder during construction and service stage at 1/30 model are studied.
红枫湖大桥由于受其所处地形和其周边环境的影响,因此该桥主梁的施工方法采用挂篮施工。
Due to the influence of topography and the environment, traveling carriage is adopted in main girder construction of this bridge.
应用推荐