在此基础上,联合降雨预报和洪水预报确定了桓仁水库动态控制汛限水位的上限。
Combined with precipitaton forecast and flood forecast, the upper bound ofdynamic control on limit water level of Huanren Reservoir in flood season was determined.
我住在桓仁。
桓仁大坝上游面施工期发现严重的劈头缝20条,威胁大坝安全。
There were 20 cracks at upstream face dam head of Huanren dam during construction which threatened dam safety.
应用推荐