利用有限杆元法,提出开洞核芯筒结构动力特性分析的数值方法。
A numerical method is then proposed by applying the method of finite member element for analysing dynamic characteristic of the structure with perforated core walls.
介绍了塔身井道核芯筒安装技术,包括核芯筒内部附着式塔吊及高强螺栓施工。
Installation technology of well core tube in tower body was introduced, including construction with attachment tower cranes and high strength bolts.
塔体由椭圆型钢结构外筒和混凝土核芯筒以及连接这两者的钢-混凝土组合结构楼面组成。
The tower structure comprises an external steel frame, an elliptical concrete core and steel-framed floors between them.
应用推荐