本文以不同杆柱载荷公式和设计方案的计算实例验证了其正确性。
Its validity is verified through the Practical example with rod load formulas and design requirements.
文章通过对条带充填开采煤柱载荷和煤柱强度的理论分析,提出了条带充填开采所需留设的合理煤柱尺寸及开采宽度。
Through theoretical analyses of the pillar stress and pillar strength in the pillar-and-stripe mining with backfilling, the rational pillar size and mining stripe opening are deter - mined.
带有10-32个螺纹的螺纹接线柱被固定在管状加热元件上,确保正极接触,用于最大安培载荷能力。
Threaded post terminals with 10-32 threads are securely fastened to the tubular heating element, assuring positive electrical contact for maximum amperage carrying capacity.
应用推荐