运用ANSYS程序对煤柱的稳定性进行了数值模拟,验证了煤柱的稳定性。
Applying the numerical simulation program ANSYS to analyze the stability of pillar, it proved pillar is stable.
从系统论的角度提出改善煤柱稳定性的新思路,即从提高稳定性最差的煤柱来改善整个煤柱系统的稳定性,并从材料和结构两个方面给出评价煤柱稳定性的指标。
From the point view of system theory, a new concept for improving the stability of the whole pillar system is put forward, and the indices of pillar stability assessment are introduced.
同时通过实测与模型计算相结合,验算了区段煤柱留设尺寸的合理性,并在此基础上探讨了沿空掘巷无煤柱开采的可行性。
Combined with field tests and numerical simulation, the size of section pillar is proved to be reasonable and the feasibility of driving without section pillar is also studied.
应用推荐