随着墙架柱间距缩小、墙体高度减小、自攻螺钉间距加密,墙体抗剪承载力明显增加。
With the decrease of stud spacing and height, screws spacing, the wall's load capacity increases obviously.
北京电视中心综合业务楼主体结构施工时,四角的L形复合巨型柱采用液压爬架。
In the main structure construction of the complex building of Beijing Television project, hydraulic climb frame is used for the construction of L-shaped complex rectangle columns at the four corners.
两个悬臂则固定在支架的内部结构上,并允许管架从贮存位置降到钻柱中线上。
The swing arms are fastened to the inside structure of the mast, and permit the pipe rack to be low-ered from the stored position to the centerline of the drill string.
应用推荐