通过仿真分析,可以对施工机械的机型、数量以及作业参数作出最佳选择,并且预测出施工的最短工期和最低施工费用。
By simulating analysis, the optimal parameters, Numbers and type of construction machinery can be obtained, and the smallest cost and shortest period of construction projects can be predicted.
指出这种优化方法尽管可实现工期最短,但无法保证资源分布的最优效果。
It points out that this method may meet the shortest time limit but could not ensure the optimum resource distribution.
提出通过计算各工序优先系数的方法进行资源限定,实现最短工期优化,使该类型的优化从定性优化变成了定量优化,为该类型的优化提供了一个新的求解思路。
This paper puts forward an optimum method by computing the priority coefficient of each working procedure to limit resources and implement the optimization of the shortest time limit for a project.