万家寨大坝坝顶各监测点的变形过程是多峰曲线。
The deformation process curve of the Wanjiazhai dam crest exhibits many peaks.
发现实施过渡方案以来,库区累计淤积量与叠加流量加权平均坝前水位的关系,符合以往的关系曲线。
It is found that the relationships between the accumulated volumes of sediment deposition in the reservoir and the average pool levels follow the earlier trend curves very well.
本研究的目的是建立一种简单实用的上游式尾矿坝非饱和带滞水曲线的数学模型。
The purpose of this research is to establish a simple and practical mathematical model for the water retention curve in unsaturated section of upstream embankment constructed tailings dam.
应用推荐