图10显示的数据流与之相同,但该数据流是沿着可选分支而不是并行分支流动的。
Figure 10 shows the same data flow, but now flowing along alternative branches instead of parallel ones.
发生的方式之一是将数据流图和用例图混淆在一起。
One way this occurs is by confusing data flow diagrams with use case diagrams.
强时间约束是指控制数据流图CDFG的延迟时间无法满足的时间约束。
The strong time constraints are the time constraints when the delay time of Control Data Flow Graph (CDFG)is not satisfied.
应用推荐