介绍广州市轨道交通四号线大学城站采用“明挖顺作法”施工的主要技术措施。
Major pit construction methods introduction to "direct excavation-shoring construction" used in University City Metro Station project of the fourth branch line of Guangzhou Metro.
大约85%的管道将兴建利用软地面掘进方法,而其余的将使用常规明挖施工方法。
Approximately 85% of the pipeline will be constructed using soft-ground tunneling methods and the remainder will be constructed using conventional open-cut methods.
为此,本文提出了在已建成的盾构隧道基础上,结合明挖法修建地铁车站的施工方案。
To this end, this thesis proposes a construction program based on the developed shield tunnel with combination of cut and cover method of construction of subway station.
应用推荐