主拱为桁架式双拱肋,钢管拱纵向分13段制造,采用无支架缆索吊机安装、钢绞线斜拉扣挂施工。
The steel pipe arch was manufactured in 13 segments vertically, erected by cable crane without support and clasped by diagonal tension steel strand.
塑料模壳适用于混凝土密肋楼盖的模板,对IC厂房无尘车间开孔密肋楼盖可拆式模壳技术进行系统阐述,并探讨施工要点及其控制方法。
Authors expound plastic formwork technology for open waffle slab of clean room in IC workshop systematically, and discuss the key problems in construction and controlling method.
拱肋纵向分7段预制,采用无支架缆索吊机安装、钢丝绳斜拉扣挂法施工。
The arch rib have been fabricated longitudinal by 7 segments, and used the non-support cable crane installation and the steel cable diagonal-tension method.
应用推荐