计算的施工期防渗墙垂直应力不大,但水库蓄水后有显著增加。
The vertical stress in diaphragm wall is not so high at the end of construction, but will increase considerably after reservoir impounding.
分析了二滩水电站在施工期、竣工蓄水后、水库水位消涨对陆生脊椎动物的影响及应采取的对策。
The influences of Ertan Hydroelectric project under construction, post completion and the water levels' rise and fall in the reservoir on terrestrial vertebrate and the measures are analyzed.