有在设计和建设过程中的景物建筑承建商和一起工作,有关斜坡的问题,渠务,地盘和土壤条件下进行沟通。
Have your building contractor and landscaper work together during the design and building process, communicating about slope issues, drainage, site and soil conditions.
一种理论是在建设过程中使用一条不断升高的笔直的或螺旋形斜坡。
One theory involves the construction of a straight or spiral ramp that was raised as the construction proceeded.
即使填充材料的压实机械整地过程中不流失,以及本地的斜坡。
Even though fill material is mechanically compacted during site preparation it doesn't drain as well as native slopes.
应用推荐