pipe laying works
管道敷设工程 ducting works ; pipe laying works
·2,447,543篇论文数据,部分数据来源于NoteExpress
黑河是西部管道工程采用大开挖方式穿越的距离最长的河流, 原油与成品油管道采用同沟敷设方式穿越该河流。
West Pipeline crossing Heihe River is the longest crossing project by a large excavation way and the method of laying both crude oil pipeline and products pipeline in a single trench.
youdao
应用推荐
模块上移
模块下移
不移动